HC250 Thick-Layer Crack-Resistant Self-Leveling Mortar
Designed for deeper leveling applications, large height differences, and damaged-floor refurbishment ahead of premium finish systems.
- Thickness
- 20 mm and above

Overview
HC250 is a thick-layer, crack-resistant self-leveling mortar formulated for applications at 20 mm and above, where large height differences or damaged substrates need to be corrected before finish materials are installed. It is suited to factories, warehouses, and parking structures, and is commonly used for base preparation beneath premium finish systems. For thin precision leveling below 10 mm, the appropriate thin-layer product such as GQ300 should be used instead.
Key Features
Deep-Fill Capability
Engineered for application at 20 mm and above to correct significant height differences.
Refurbishment-Ready
Suited to rebuilding damaged or degraded substrates ahead of new finish installation.
Reduced Cracking Risk
Formulated to reduce shrinkage and cracking risk under specified application conditions at depth.
Heavy-Duty Base Preparation
Appropriate for factory, warehouse, and parking-structure base preparation.
Application Scope
- Factories and industrial workshops
- Warehouses and logistics facilities
- Parking structures
- Damaged-floor refurbishment projects
- Base preparation beneath premium finish systems
Technical Parameters
- Thickness
- 20 mm and above
- Compressive Strength (28d)
- ≥ 35.0 MPa
- Flexural Strength (28d)
- ≥ 15.0 MPa
- Dry Density
- ≈ 2000 kg/m³
- Dimensional Change Rate
- -0.10% ~ +0.10%
- Combustion Performance
- Class A (A1)
Values reflect typical formulation targets and may vary by batch and specified test method.
Process & Application Guidance
- Step 1
Substrate Assessment
Height differences and structural condition are surveyed to plan the fill depth.
- Step 2
Substrate Preparation
Damaged material is removed and the base is cleaned and primed.
- Step 3
Metered Mixing
Mortar is mixed to the specified ratio for deep-fill placement.
- Step 4
Thick-Layer Placement
Material is placed in the required depth and leveled across the working bay.
- Step 5
Extended Curing
Additional curing time is allowed to suit the greater application depth.
- Step 6
Finish-Layer Handover
Prepared base is verified before a thin-layer leveling or finish system is applied.
Request HC250 Technical Data
Share your project details and our technical team will respond with specifications, documentation, or sample availability.


